Få nya jobb via e-post
  •  ...centers. Your focus is on how the entire power chain fits together – from grid connection and utility interface, through MV/LV distribution, generators, UPS and protection, all the way to the IT load – rather than on being the deepest specialist in a single product.... 

    EcoDataCenter

    Falun
    8 dagar sedan
  •  ...data centers. Your focus is on how the whole thermal chain fits together from heat sources in the IT rooms through air and liquid distribution to heat rejection and heat reusage rather than on being the deepest specialist in a single product. You work closely with our... 

    EcoDataCenter

    Falun
    20 dagar sedan
  •  ...of our data centers. Your focus is on how the whole power chain fits together – from utility and generators, through UPS and LV distribution, to the IT load – rather than on being the deepest specialist in a single product. You work closely with our power OEMs, design... 

    Ecodc AB

    Borlänge
    16 dagar sedan
  •  ...our data centers. Your main focus is how all the mechanical systems fit together – from heat rejection and plant rooms through distribution, to room cooling and interfaces to the IT load – not just deep expertise in one specific product. You work closely with cooling... 

    Ecodc AB

    Borlänge
    16 dagar sedan
  •  ...projects cover: Groundworks and civil works Structural frame and building envelope Internal build and fit-out MV/LV power distribution UPS generators and switchgear Cooling systems (chillers CRAC/CRAH pipework pumps dry coolers) BMS/PME and other control and... 

    EcoDataCenter

    Borlänge
    en månad sedan